Project/Outcome
Our new customer was very pleased with how we were able to reverse engineer the helmet pad geometry, design and build a prototype tool and then compression mold prototype parts; all within a 4-week timeframe.
We then built the production tooling for this pad and have been manufacturing these pads for several years. Since then, this customer has had us develop other molded foam hockey helmet pads for their product line. The relationship has developed into a mutually successful partnership and we look forward to continued growth with this customer.